综合人妻久久一区二区精品_亚洲欧美国产va在线播放_天天做天天做天天综合网_青草青草久热精品视频在线观看

Rotary Dies CNC Cutting Machine

Rotary Dies CNC Cutting Machine
Rotary Dies CNC Cutting Machine

Rotary Dies CNC Cutting Machine(圖1)

Rotary Dies CNC Cutting Machine(圖2)

Rotary Dies CNC Cutting Machine(圖3)

Rotary Dies CNC Cutting Machine(圖4)

Rotary Dies CNC Cutting Machine(圖5)

Rotary Dies CNC Cutting Machine(圖6)

Rotary Dies CNC Cutting Machine(圖7)


Performance
1.  High rigidity machine bed with annealing process to ensure the accuracy of the machine, to
be stable for a long time.
2.  Fully closed design, isolation of dust, no pollution.
Product Paramenters
Model No.
TSD-RC300
Cutting Length
3000mm
Cutting Diameter
φ200-800mm
Cutting Width
1.42mm
Positioning Accuracy
0.1mm
Cutting Speed:
20-25meters/hour for 13mm thickness rotary board
Machine Electricity:
380V 50Hz/60Hz 3Phases
Cooling system:
CW-3000 chiller to cooling main motor
Gas
Air compressor supported to blow dusty, no need air dryer
Numerical control panel
LCD screen, light-touched key-press computer
Software supported
Auto CAD drawing
Graphic format support
AUTO CAD DXF file
EMS memory
attached 32MB memory, can work under off-line condition
Knife Matching
Original 50 pieces
Assistant equipment
CW-3000 chiller, and air compressor.
Machine Weight
2500KG
Machine Overall Dimension
4800*1500*2000mm
Total Power
2000W
Why Choose Us
We are professional dies machine manufacturer:
1.We only production co2 laser die cutting machine and its supporting die blade bending machine blade bending machine.
2. CE certificate, Reasonable price, machine stable, Experienced & Responsible QC that you can rely on.
3. We have exported our machine to Indonesia, Kosovo, Egypt, Sri Lanka, India, Philippines, Bengal, Vietnam, Kuwait,
Algeria....etc.
4. Adequate supply capacity ( 50sets / month ), Punctual delivery time(2-3 Weeks) .
5. Home market: Guangdong, Jiangsu, Zhejiang, Fujian, Hunan, Jiangxi, Shandong, Sichuan, Henan, Shanxi, Shanxi, Beijing,
Shanghai,Hebei, Inner Mongolia, Guangxi, HK ... Etc.
6. Our affiliates in the country: East Division, Office of Hebei, Hangzhou Office, Office of Fujian


Our Service
Shenzhen TSD Laser Equipment Co., Ltd adheres to the customer-oriented service concept, providing complete installation,
commissioning, inspection, training, maintenance and other pre-sales and after-sales service.

Pre-sales service:
We provide customers with a variety of services including production processes proposals, technical consulting, free sample
making, equipment shape designing.Machine-installation & debugging:According the contract, our company will ship the equipment to
the port of Shenzhen or domestic user specified location. Qualified technician will be send to customer’s company for machine
installation and debugging. Under the proper circumstance, the technician will finish installation within three days. Please keep
the installation place clean and tidy.

Training:
After machine installation and testing, qualified technician will be send to customer’s company for training (machine operation,
machine maintenance, machine debugging, product sample processing, etc). TSD Laser also welcome our customers to come to Chinese
headquarter for machine training. The training is free of charge and it will last at least 3 days until the operator of customers’
can use the machine properly and correctly.

Maintenance:

Complete and perfect after-sales service
One year warranty and lifetime maintenance for the equipment
Lifetime free of charge support and upgrade for hardware and software
FAQ
Q1: What should i need to prepare for machine?
A2:Air compressor, electricity, space.

Q2: What's the warranty?

A3:1 year for main machine and laser tube, 6 months for lens and mirror.

Q3: How long the life of laser tube?

A4:6000 hours in normal, but also depend on your working time and quality of tube. Some of our customers can use 1 year even
longer time.
Q4: Is any assistance for machine installation and training?
A5:Sure, we will send our engineer to your factory for machine installation and training, the whole training course will take
around 5 days. Round-trip ticket, food and hotel fee on your side.
Q5: Is it possible to visit your factory before order?
A6:Certainly, warmly welcome to visit our factory to further discuss about machine and die making.